Introduction:

Dainese, a globally renowned name in high-performance motorbike clothing and accessories, prides itself on providing customers with quality products and a premium shopping experience at its Manchester store. When their existing heating system unexpectedly failed, maintaining a comfortable environment for both customers and staff became an immediate challenge, especially with the unpredictable Manchester weather. Dainese Manchester contacted Winrow Ltd to deliver a swift and effective solution.

The Challenge: System Failure and Suboptimal Air Distribution

The primary issue was the complete failure of the store's heating system, leaving the retail space cold and unwelcoming. Furthermore, the existing system's configuration resulted in poor air distribution, meaning some areas of the shop were likely experiencing inconsistent temperatures even when the previous heater was operational. Dainese required a rapid replacement that would not only restore heating but also improve its overall effectiveness and distribution throughout the store, all while minimising disruption to their daily business operations.


The Solution: Strategic Heater Replacement and Relocation

After a thorough assessment by the Winrow Ltd engineering team, it was determined that the most effective solution would be the installation of a new XR60 warm air heater. This unit was selected for its reliability, efficiency, and suitability for the retail space.


Crucially, the Winrow team also identified an opportunity to significantly enhance heating performance by strategically relocating the new heater. This new positioning was designed to optimise air distribution, ensuring a consistent and comfortable temperature throughout the entire shop floor and eliminating previous cold spots.


Implementation: Seamless Installation with Minimal Disruption

Winrow Ltd understood the critical importance of Dainese Manchester remaining operational. Our team meticulously planned and coordinated the installation process directly with the store staff. Key aspects of the implementation included:

  • Collaborative Scheduling: We worked closely with Dainese management to schedule the installation at times that would cause the least possible disruption to their retail activities and customer flow.
  • Efficient Installation: Our experienced engineers carried out the installation efficiently and professionally, ensuring the store did not need to close at any point during the works.
  • Optimised Controls: Post-installation, and in consultation with the client, the new XR60 heater was set to maintain a consistent temperature of 21°C during the shop's opening hours. This was programmed using a DB8 password-protected time clock, giving Dainese staff full control over their heating schedule while preventing unauthorised adjustments.


Outcome: Restored Comfort and Enhanced Efficiency

The new XR60 heating system and its optimised location have provided Dainese Manchester with:

  • Reliable and Consistent Heating: The store now enjoys a consistently warm and comfortable environment for customers and staff.
  • Improved Air Distribution: The strategic relocation of the heater has ensured even heat distribution across the entire retail space.
  • Controlled Environment: The password-protected time clock allows for precise temperature management, optimising comfort during opening hours and contributing to energy efficiency.
  • Zero Business Downtime: Thanks to careful planning and execution, the entire installation was completed without any interruption to Dainese's business operations.


Client Satisfaction:

Dainese Manchester was pleased with the swift response, professional installation, and the significantly improved heating performance within their store. The ability to continue trading without disruption was a key factor in their satisfaction with Winrow Ltd's service.


Conclusion:

This project for Dainese Manchester highlights Winrow Ltd's ability to provide rapid, effective, and minimally disruptive heating solutions for retail environments. By not only replacing a failed unit but also optimising its placement and controls, we delivered a significantly improved heating outcome that supports our client's business operations and enhances their customer experience.

Winrow Buildings Ltd Runcorn

Share This Post.

Need a Quote?


Is your business is looking for heating upgrade or an installation quote? Please call us on 08000 588 035 for a free quotation or fill out our contact form and we’ll get back to you as soon as we can.


If you could also attach some relevant images of the building and advise the building volumetric, it will help with our initial design assessment. Thank you.

Winrow - Enquiry Form


Industrial Heating - Latest News

Empty industrial warehouse interior with roll-up doors, bright overhead lighting.
By Winrow February 16, 2026
Purchasing and installing a commercial heating system is only the beginning of utilising a new system. The maintenance of heating systems is arguably one of the most crucial elements in ensuring optimal performance, the lifespan of the equipment, and reducing operational costs in the running of a commercial heating system. Importance of Regular Maintenance of Heating Systems To ensure optimal performance, it is recommended that a maintenance program be adhered to based on the facility in which it has been installed and the equipment in place. The idea of preventive maintenance also plays a role in this, making sure that the commercial heating system is routinely inspected and maintained, allowing any small issues to be identified before they potentially become more costly issues down the track. While you may be thinking that sticking to a routine maintenance schedule may not be important, there are certainly downsides to not maintaining your commercial heating system in place. Some challenges that can be experienced include increased wear and tear, more energy can be consumed with outdated and non-maintained systems, poor insulation can lead to wasted energy, and unbalanced heating across areas of the commercial space.
Gray heat pump unit mounted on a stucco wall.
By Winrow February 16, 2026
Improve efficiency and asset value by retrofitting older buildings with modern heating technology. Discover cost savings, ESG benefits, and hydrogen-ready solutions with Winrow Ltd.
By Winrow February 3, 2026
Reduce your warehouse heating costs by up to 30%. Discover innovative heat recovery strategies and destratification techniques tailored for UK industrial facilities.
Row of white air conditioning units outside a building, with black metal stairs.
By Winrow Building December 18, 2025
Prioritising efficiency is key to a sustainable, responsible future. Contact Winrow today to schedule a site survey
Gray HVAC unit suspended from the ceiling of an indoor sports facility.
By Winrow building December 10, 2025
When it comes to maintaining optimal conditions in industrial spaces, choosing the right industrial heating solution is far more than a matter of comfort.
Industrial air conditioning units with fans, mounted on a wall.
By Winrow Building December 3, 2025
Reducing carbon emissions remains a pressing global issue, with heating in the UK standing out as a significant contributor to greenhouse gas production